top of page
![Jamtek Logo.png](https://static.wixstatic.com/media/0f6d22_29f42a5ba78145f5a2e36790b8d6ee7b~mv2.png/v1/fill/w_732,h_76,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/Jamtek%20Logo.png)
![TorrenstoTorrens1.jpg](https://static.wixstatic.com/media/0f6d22_8ae2abd5581d43eab17d17117d4dfb93~mv2.jpg/v1/fill/w_882,h_455,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/0f6d22_8ae2abd5581d43eab17d17117d4dfb93~mv2.jpg)
Torrens to Torrens
![](https://static.wixstatic.com/media/035244_881cbe4617f449cab844cb6a48b5fbeb~mv2_d_2475_2475_s_4_2.jpeg/v1/fill/w_607,h_607,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/035244_881cbe4617f449cab844cb6a48b5fbeb~mv2_d_2475_2475_s_4_2.jpeg)
![T2T5](https://static.wixstatic.com/media/0f6d22_0b98be402fd54ff7b5d10460c2ae9d9c~mv2.jpg/v1/fill/w_980,h_1307,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/0f6d22_0b98be402fd54ff7b5d10460c2ae9d9c~mv2.jpg)
T2T5
![t2t9](https://static.wixstatic.com/media/0f6d22_0a4f69f7075c4ff9ac01406c10612831~mv2.jpg/v1/fill/w_980,h_980,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/0f6d22_0a4f69f7075c4ff9ac01406c10612831~mv2.jpg)
t2t9
![T2T4](https://static.wixstatic.com/media/0f6d22_c914b274814144bb989e3e4154cc4de9~mv2.jpg/v1/fill/w_980,h_713,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/0f6d22_c914b274814144bb989e3e4154cc4de9~mv2.jpg)
T2T4
![T2T5](https://static.wixstatic.com/media/0f6d22_0b98be402fd54ff7b5d10460c2ae9d9c~mv2.jpg/v1/fill/w_980,h_1307,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/0f6d22_0b98be402fd54ff7b5d10460c2ae9d9c~mv2.jpg)
T2T5
1/8
About the Project
The $800m Torrens Road to River Torrens Project delivered a 4km non-stop roadway, between Torrensville, and Croydon Park, providing significant travel time saving to commuters and freight.
​
Jamtek Structural completed the largest concrete packages on the project including 4km of top of wall barrier slabs of installation of precast barrier units. Jamtek also completed various bridge works and the Grange Rd bridge.